Dynamic System Modeling and Control Design
(Spring 2025)

You are not logged in.

Please Log In for full access to the web site.
Note that this link will take you to an external site (https://shimmer.mit.edu) to authenticate, and then you will be redirected back to this page.
You are viewing the 6.3100 Spring 2025 web site. Please note that information on this page may change throughout the semester, please check back frequently.
Announcements:
No Office Hours Until Sunday 2/9!
First Prelab Due 2/14 10am.

Lectures 1-190 (NOTE CHANGE): Mondays and Wednesdays, 3pm
Labs 38-528: Fridays 10am-1pm or Fridays 2pm-5pm
Office Hours 38-528: Tuesdays and Thursdays 7:30pm-10:30pm and Sundays 2pm-5pm, 7:30pm-10:30pm

Tentative calendar: details may change as the semester proceeds.
Week Lecture A
(Monday)
Lecture B
(Wednesday)
  Prelab   Lab   Postlab  
1Feb 3
Introduction to Control
Feb 5
First-Order Systems
Handout  
Prelab 1Lab 1:
Fast and Spurious
A
2Feb 10
Linearity, Time Invariance, and Steady-State
Handout  
Feb 12
System Identification
Handout  
Lab 1:
Fast and Spurious
B
PRELAB REQUIRED!
Postlab 1: Fast and Spurious
3Feb 17
Second Order Systems
Handout  
Feb 19
Matrix DEs, Evalues, Nat Freqs
Handout  
Prelab 2Lab 2:
Code Of Arms
A
4Feb 24
PD and PID Controllers
Feb 26
Stability and Steady-State
Lab 2:
Code Of ArmsB
PRELAB REQUIRED!
Postlab 2: Code of Arms
5Mar 3
From DT to CT
Mar 5
CT System Functions and Block Diagrams
Prelab 3Lab 3:
A Disturbance in the ForceA
6Mar 10
Transfer Functions, Blacks Formula
Mar 12
Frequency Response, Disturbance Rejection
Lab 3:
A Disturbance in the ForceB
PRELAB REQUIRED!
Postlab 3: A Disturbance in the Force
Postlab Solutions
7Mar 17
Poles, Zeros, and Frequency Response
Mar 19
Gain and Phase Margins, PD Control
Prelab 4Lab 4:
Marginal Maglev: Simplified ModelA
8Mar 31
Lead Compensation
Apr 2
Disturbance, Lead, Lag, Lead-Lag
Lab 4:
Marginal Maglev: Lead DesignB
PRELAB REQUIRED!
Postlab 4: Marginal Maglev
9Apr 7
State-Space Approach
Apr 9
Transfer Functions and State-Space
Prelab 5
10Apr 14
State Space Control Design
Apr 16
CT to DT in State Space
Lab 5:
Win, Place, LQRA
PRELAB REQUIRED!
11Apr 21
Patriots Day
(no lecture)
Apr 23
Linear Quadratic Regulators
Lab 5:
Win, Place, LQRB
PRELAB REQUIRED!
Postlab 5: Win, Place, LQR
12Apr 28
Tracking Errors and Disturbances
Apr 30
State-Space Control with Observers
Prelab 6Lab 6:
Observe and LearnA
Postlab 6: Learn and Observe
13May 5
Observer Design
May 7
Noise Performance
Lab 6:
Observe and LearnB
PRELAB REQUIRED!
14May 12
What's Next?
May 14
No Class
No lab